The current public teaser describes a 5.94 MW solar plant with 9 MW / 36 MWh storage on ≈ 11.5 ha of leased land in Vinnytsia region. It reports 9 MW available at a nearby substation, while grid technical conditions remain in progress; the project is therefore shown at development stage, not as ready to build or operating. Six parcels are described as held through separate legal entities. Investor options include build-and-operate, turnkey delivery and site preparation. The build-and-operate option states an individual entry from USD 500,000; the developer remuneration and other terms require direct confirmation. Current rights, grid capacity and availability also require confirmation.
Project readiness
Land / site
≈ 11.5 ha leased across six parcels; rights require review.
Grid connection
9 MW spare substation capacity reported; technical conditions are being obtained.
Permits
Grid technical conditions and remaining permits require confirmation.
Construction
Development stage; physical construction status not established.
Electricity sales model
Trading forecasts are promoter estimates; realised operating revenue is not established.
Proposal to the investor
Build and operate, turnkey delivery or prepared-site entry; the build-and-operate model starts at USD 500,000, with other terms to confirm.
Known constraints & open questions
Grid technical conditions are in progress despite construction-oriented wording in the teaser. Confirm land leases, connection capacity, legal-entity perimeter and current commercial terms; no RTB status is asserted.
Available documents
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
About project information
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.