Project ID TSU-002
Solar + BESS8.7 MW DC Solar + 7.5 MW / 30 MWh BESS — Zakarpattia region
Zakarpattia region
- Component capacities
- Solar: 8.7 MW DCBESS: 7.5 MW / 30 MWh
- Stage
- Ready to build
- Transaction format
- Equity participation
Project ID TSU-014 / Khmelnytskyi region
120 MW Wind + ≈80 MWh BESS — Khmelnytskyi region. Development. Target RTB: around March 2028; target commissioning: 2029. Storage configuration is subject to confirmation; ≈ 80 MWh is indicated, with an 80 MW-class power configuration also under consideration. Strategic investor around 50%; possible 100% RTB acquisition via forward transaction.
Available upon request.
Strategic investor around 50%; possible 100% RTB acquisition via forward transaction.
The transaction perimeter and supporting technical, legal and commercial documentation are available for further clarification upon request.
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.
Evidence labels and limitationsProject ID TSU-014
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
Share a short request without confidential documents. Checking form availability.
Project ID TSU-002
Solar + BESSZakarpattia region
Project ID TSU-003
WindZakarpattia region
Project ID TSU-004
Solar + BESSOdesa region