The public listing describes a ready-to-build solar and battery project in Ukraine. Solar generation is ≈ 20 MW, and the battery is rated at 20 MW / 40 MWh. A 49-year land lease is reported. Grid connection technical conditions and a connection scheme are reported as obtained or agreed, and project and permitting documentation is reported as prepared. The proposal concerns acquisition of the developed project. The exact region, legal transaction perimeter, ownership, current price and availability require direct confirmation.
Project readiness
Land / site
49-year lease reported; supporting rights require review.
Grid connection
Technical conditions and connection scheme reportedly obtained or agreed.
Permits
Project and permitting documentation reportedly prepared.
Construction
Presented as ready to build; physical works not confirmed.
Electricity sales model
Not publicly disclosed.
Proposal to the investor
Acquisition of the developed project; legal transaction perimeter subject to confirmation.
Known constraints & open questions
Region, land and grid rights, documentation, indicative asking price, transaction terms and current availability have not been independently verified.
Available documents
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
About project information
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.