153.3 MW Solar + 105 MW / 255.5 MWh BESS — Dnipropetrovsk Region — TSU-112

Project ID TSU-112 / Dnipropetrovsk region

Ready to build

SolarBESSHybrid

Updated

Transaction availability unconfirmed
Request details

Project overview

The public listing, dated 19 March 2026, presents this Dnipropetrovsk region hybrid project as ready to build. Its headline gives 153.3 MW solar and 105 MW / 255.5 MWh BESS, while the linked project teaser gives 105 MW / 215 MWh. The teaser also states EUR 112 million total project cost; a separate monitoring figure cites USD 117.5 million as an investment need. These amounts have different stated bases and have not been reconciled. The promoter reports a projected 20.02% IRR; it is not an independently verified return. The current technical design, financing requirement, document status and availability require direct confirmation.

Project readiness

Land / site
Land rights are reported in the public project teaser; documents not reviewed.
Grid connection
Grid works and technical conditions are described in the teaser; current connection scope requires review.
Permits
Ready-to-build is the public listing status; underlying permits require review.
Construction
Presented as ready to build; construction progress not confirmed.

Electricity sales model

Generation and return forecasts are promoter estimates, not verified operating results.

Proposal to the investor

Co-financing, debt financing and private investment are publicly invited; instrument, security and transaction perimeter to confirm.

Known constraints & open questions

Public listing and project teaser disagree on BESS energy (255.5 versus 215 MWh). USD 117.5 million reported financing need and EUR 112 million teaser project cost are not interchangeable. Confirm both, as well as current RTB evidence and availability.

Available documents

Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.

No document list approved for publication.

About project information

Verification scope not disclosed

Publication approval does not confirm seller authority or transaction availability and is not full due diligence.

The record update date is not a verification date. An enquiry does not confirm that a transaction is available.

Evidence labels and limitations

Request details

Project ID TSU-112

Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.

Share a short request without confidential documents. Checking form availability.

Describe your interest and intended transaction. Do not include confidential information.

Tillerstone, LLC uses your details to review and respond to your enquiry. See our Privacy policy. Do not include confidential documents, identity documents or precise project coordinates. Initial project information is unverified. Submitting an enquiry creates neither an engagement nor an NDA.

If the form is unavailable, email contact@tillerstone.eu without confidential documents.

Similar projects

Project ID TSU-001

Solar

Solar Portfolio — Vinnytsia / Kirovohrad Regions

Vinnytsia / Kirovohrad regions

Component capacities
Solar: 0.75 MW ACSolar: 1 MWSolar: 3 MWSolar: 4 MWSolar: 5 MWSolar: 5 MWSolar: 7.2 MW AC
Stage
Solar: Operational · Solar: Operational · Solar: Operational · Solar: Operational · Solar: Operational · Solar: Operational · Solar: Commissioning — operation to confirm
Transaction format
Sale
Asking priceIndividual lot prices; portfolio terms on request

Privacy policy · Cookie policy