The public listing dated 19 March 2026 describes a Mykolaiv region solar and storage project at pre-feasibility stage. Its rounded headline is 54 MW solar plus 43 MW / 86.5 MWh BESS; the linked teaser specifies 53.98 MW solar and 43.25 MW / 86.5 MWh BESS. The concept includes shoreline pile-mounted solar structures. Co-financing, debt and private investment are described. The primary listing does not display a usable investment amount; a secondary public figure of USD 45.54 million is not treated as a confirmed funding ask. The reported 17.34% IRR is a forecast, not verified performance.
Project readiness
Land / site
Site and land rights require confirmation.
Grid connection
Grid-connection status has not been confirmed.
Permits
Pre-feasibility concept; permitting status to review.
Construction
Development / pre-feasibility; construction not confirmed.
Electricity sales model
Projected generation and IRR are promoter estimates; offtake has not been confirmed.
Proposal to the investor
Development-stage co-financing, debt or private investment; amount, instrument and terms to confirm.
Known constraints & open questions
Pre-feasibility only; land, grid and permits require review. The primary listing omits the investment amount, and a secondary USD 45.54 million figure is unconfirmed.
Available documents
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
About project information
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.