A land site is offered for a hybrid energy development in Dnipropetrovsk region. The concept comprises 54 MW of cogeneration, 15 MW of solar PV and 50 MW / 200 MWh of battery storage. The project is at the pre-design stage. Combined grid export is planned at up to 50 MW.
Project readiness
Land / site
The site has been identified; rights and the asset perimeter require pre-transaction review.
Grid connection
The project initiator reports that an application for grid connection terms has been submitted. Issuance remains to be confirmed.
Permits
Planning approvals are in progress.
Construction
Pre-design preparation.
Electricity sales model
The commercial model is to be refined during project development.
Proposal to the investor
Sale of the land site for an energy complex. The rights to be transferred and final transaction terms are to be agreed with the owner.
Known constraints & open questions
Combined grid export is planned at up to 50 MW. The project initiator reports that gas connection terms have been obtained. The project initiator reports that an application for grid connection terms has been submitted. Issuance remains to be confirmed. Planning approvals are in progress.
Available documents
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
Gas network connection termsIssued. A copy was provided.
Gas supply agreementsCopies were provided of the connection agreement, the addendum and the contract for works on the internal gas network.
Site topographic planA copy was provided.
Geodetic and geological survey materialsThe project initiator reports that these materials are available.
About project information
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.