Project ID TSU-002
Solar + BESS8.7 MW DC Solar + 7.5 MW / 30 MWh BESS — Zakarpattia region
Zakarpattia region
- Component capacities
- Solar: 8.7 MW DCBESS: 7.5 MW / 30 MWh
- Stage
- Ready to build
- Transaction format
- Equity participation
Project ID TSU-116 / Western Ukraine
Participation through an energy cooperative: the source describes associate membership. Rights and participation terms require clarification.
A western Ukraine storage development is publicly raising contributions for 5 MW / 15.045 MWh BESS, with a stated project budget of USD 4,500,000 and entry from USD 25,000. The structure is associate membership in a cooperative, with rights to a share of its property and profit. It is not presented as a direct purchase of shares in a project LLC. Commissioning is targeted for Q2 2027. The sponsor advertises 25% annual income over ten years; this is an indicative sponsor claim, not independently verified by Tillerstone.
Forecasts are sponsor estimates. Current commercial arrangements require confirmation.
Associate cooperative membership from USD 25,000. Membership rights, payments, exit and transfer terms require documentary review.
The current primary page states 15.045 MWh. Confirm the design, site, permits, cooperative documentation and entry terms. This membership offering is excluded from aggregate capacity totals under the catalogue methodology.
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.
Evidence labels and limitationsProject ID TSU-116
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
Share a short request without confidential documents. Checking form availability.
Project ID TSU-002
Solar + BESSZakarpattia region
Project ID TSU-004
Solar + BESSOdesa region
Project ID TSU-005
Solar + BESSVinnytsia region