Solar + BESS8.7 MW DC Solar + 7.5 MW / 30 MWh BESS — Zakarpattia region
Zakarpattia region
- Component capacities
- Solar: 8.7 MW DCBESS: 7.5 MW / 30 MWh
- Stage
- Ready to build
- Transaction format
- Equity participation
Project ID TSU-118 / Chernivtsi region
A development-stage 3.25 MW / 10.3 MWh battery project in Chernivtsi region invites equity participation in a project LLC. The sponsor states EUR 2,100,000 total cost, EUR 500,000 raised and entry from EUR 29,000. Its proposed capital split is 80% investors and 20% management company. Construction is planned for Q4 2026 and commissioning for Q2 2027; the stated subscription deadline is 15 November 2026. The advertised 19–21% annual return is an indicative sponsor projection, not independently verified by Tillerstone.
Forecasts are sponsor estimates. Current commercial arrangements require confirmation.
Equity participation in a project LLC from EUR 29,000; proposed capital split 80% investors / 20% management company.
Confirm current subscription status, claimed funds raised, land, connection, permits, share rights and timetable. Planned dates and returns are not verified operating results.
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
No document list approved for publication.
Verification scope not disclosed
Publication approval does not confirm seller authority or transaction availability and is not full due diligence.
The record update date is not a verification date. An enquiry does not confirm that a transaction is available.
Evidence labels and limitationsProject ID TSU-118
Document names and availability only. Access is arranged separately with seller permission and applicable confidentiality checks.
Share a short request without confidential documents. Checking form availability.